This facility will be designed to meet the requirements of global hyperscalers, frontier labs, enterprises, and Indiaโs sovereign AI initiatives at scale and in a speedy manner using carbon-free energy.
AM Green Group, an energy transition platform backed by the founders of Greenko Group, has signed a Memorandum of Understanding (MoU) with InvestUP, the Government of Uttar Pradesh, to establish a 1 GW data centre to serve global AI workloads. AM Green will establish an AI infrastructure hub in the Greater Noida region in Uttar Pradesh. This grand-scale project will be developed in a phased manner, with the first capacity coming up in 2028, and full 1 GW capacity targeted to come up by 2030, and a total investment of USD 25 billion.ย
“This project will be a multi-billion-dollar investment for the setup of a GW-scale data centre along with 500,000 latest high-performance chipsets and will be one of the largest investments in the country to date, aligned with the Indian Governmentโs Viksit Bharat 2047 vision to accelerate the expansion of AI-driven services,” the company said.
Powering the future of AI and high-performance computing
This facility will be designed to meet the requirements of global hyperscalers, frontier labs, enterprises, and India’s sovereign AI initiatives at scale and in a speedy manner using carbon-free energy.ย
AMG AI Labs is working on developing an AI full-stack ecosystem with the most efficient on-demand electron-to-token architecture. The AI labs ecosystem comprises capabilities across energy, infrastructure, hardware installation, and customised models and applications with end-use cases across a multitude of sectors, including energy, healthcare, sovereign cloud services, manufacturing, automotive, media and gaming, and others.ย
Facilities to be available at the data centre
- Scalable Infrastructure: A phased rollout with the first capacity being operational by 2028, scaling to the full 1 GW by 2030.
- Strategic Location:ย Utilising Uttar Pradeshโs robust industrial corridors and favourable Data Centre Policy to provide low-latency and highly reliable connectivity to growing digital markets.
- Green Energy Integration: Leveraging AM Greenโs leadership in renewable energy, the facility will be powered by 24/7 carbon-free energy solutions,ย including wind, solar, and pumped storage.